Urea Production Reactor Renovation Construction
Our project consists of phases, such as loading and transport of the Urea reactor, disassembling of the Urea reactor and connection lines, transporting of the previous reactor to the storage area, installation and follow-up of the connection lines with suitable supports, tools, ladders, platforms, structures, installation, and isolation works for the new Urea reactor.
PROJECTS
© 2024 All Rights Reserved